PLM software

PLM: drawings, BOM and engineering change management

Production always works from the latest approved drawing, and every change is recorded with its owner, date and reason.

The system is designed around your engineering workflow and deployed in stages without interrupting work.

Capabilities

Areas covered

The scope of each project is put in writing before work starts.

  1. 01

    Drawing vault with revision control

    Drawings and design files are kept in one vault with all revisions, and the valid revision is clearly identified.

  2. 02

    Bill of materials (BOM)

    The product's multi-level structure, from assembly to individual part, with quantities and part numbers.

  3. 03

    Engineering change workflow

    Change requests are logged, approved according to the defined workflow and then released to production.

  4. 04

    Traceability

    The drawing revision and BOM used to build each order are recorded.

  5. 05

    Role-based access

    Access for designers, approvers and production is defined by role.

  6. 06

    Links to inventory and production

    The BOM is passed to inventory and production planning, and connected to your ERP where an integration route exists.

Results after delivery

  • Approved revisions only

    Only the approved revision of a drawing is released to the shop floor.

  • Change documentation

    The history of each change, with its reason and approver, is recorded in the system.

  • Fast search

    Drawings and parts can be found by number or name within seconds.

  • Full ownership

    The system, data and documentation are installed on your server and handed over to you.

Delivery

Project stages

Each stage begins only after the output of the previous stage is approved.

  1. 01

    Site visit and discovery

    Current practices for storing drawings and recording changes are reviewed on site.

  2. 02

    Plan and agreement

    Part numbering, the approval workflow and the scope are written down before work starts.

  3. 03

    Migration of drawings and BOMs

    Existing files and parts lists are imported into the system under the agreed numbering scheme.

  4. 04

    Staged roll-out

    The drawing vault is deployed first, followed by BOMs and the change workflow, without interrupting engineering work.

  5. 05

    Training and support

    Team training, handover of documentation and access, and post-handover support.

Core tools and capabilities

  • Drawing revision control
  • Multi-level BOM
  • Engineering changes (ECR/ECO)
  • Approval workflow
  • CAD files
  • Inventory and ERP integration

Questions

Common questions

A shared folder does not record which revision is valid, who changed a file or which part belongs to which product. PLM records and controls this information.

Yes. CAD files (such as SolidWorks and AutoCAD) and drawing PDFs are stored with revision control, and design continues in your existing software.

Yes. Migrating and numbering existing drawings and BOMs is one of the project stages.

With a visit to the engineering department. The starting point is set according to current problems, such as a wrong revision reaching the shop floor or unrecorded changes.

For other questions, contact a LIDTAK specialist.

Book a free consultation